Services provided by Kirby Smith & Associates, Inc. included facilitating the negotiation of key site plan regulatory issues with the city staff in order to allow final site configuration, and preparation of landscape plans for 1.85 acre limited service hotel.
Services provided by Kirby Smith & Associates, Inc. included facilitating the negotiation of key site plan regulatory issues with the city staff in order to allow final site configuration, and preparation of landscape plans for 1.85 acre limited service hotel.

 

 

 

 

 

 

 

KSA, Inc's responsibilities for this 160 acre mixed use site included preparation of multiple land use master plan alternatives, and collaboration with engineering consultants regarding alternative flood plain improvements. A preliminary site plan concept was also prepared in compliance with the Gateway zoning regulations, and design guidelines, for the Client’s use in preparing development cost estimates, and marketing the site to potential end users.KSA, Inc's responsibilities for this 160 acre mixed use site included preparation of multiple land use master plan alternatives, and collaboration with engineering consultants regarding alternative flood plain improvements. A preliminary site plan concept was also prepared in compliance with the Gateway zoning regulations, and design guidelines, for the Client’s use in preparing development cost estimates, and marketing the site to potential end users.

 

 

 

 

 

 

 

The owners of the Santa Fe Park & Greenwood Office Center properties were each interested in determining the amount of future developed that could be attained.  Alternative conceptual site plans were prepared by Kirby Smith to evaluate the City’s                  regulatory requirements and arrive at a                               defensible solution to maximize the site’s                             potential. Illustrative site plans were                                   prepared for the owner’s evaluation and marketing purposes.
The owners of the Santa Fe Park & Greenwood Office Center properties were each interested in determining the amount of future developed that could be attained. Alternative conceptual site plans were prepared by Kirby Smith to evaluate the City’s regulatory requirements and arrive at a defensible solution to maximize the site’s potential. Illustrative site plans were prepared for the owner’s evaluation and marketing purposes.

 

 

 

 

 

 

 

The Use By Special Review and Site Plan application for Sam’s Automotive was prepared and directed by Kirby Smith, in 1989. Submittal and approval processing for this automobile estimating facility included  the preparation of  a detailed site  plan and landscape plan, along with neighborhood, City, and referral agency coordination and presentations.  Plans approved in 1989.The Use By Special Review and Site Plan application for Sam’s Automotive was prepared and directed by Kirby Smith, in 1989. Submittal and approval processing for this automobile estimating facility included the preparation of a detailed site plan and landscape plan, along with neighborhood, City, and referral agency coordination and presentations. Plans approved in 1989.

 

 

 

 

 

 

 

 

A Planned Building Group Site Plan Amendment was required for the redevelopment of portions of this existing  10 acre commercial site.  Kirby Smith & Associates, Inc. provided site plan revisions and landscape plan for additional improvements throughout the site.  In addition KSA, Inc. also  provided site and landscape design services for two new drive-thru restaurants near the north end of the property.  Responsibilities for these approvals included preparation of  PBG plan documents and coordination with the project team,                         City staff, and referral agencies.A Planned Building Group Site Plan Amendment was required for the redevelopment of portions of this existing 10 acre commercial site. Kirby Smith & Associates, Inc. provided site plan revisions and landscape plan for additional improvements throughout the site. In addition KSA, Inc. also provided site and landscape design services for two new drive-thru restaurants near the north end of the property. Responsibilities for these approvals included preparation of PBG plan documents and coordination with the project team, City staff, and referral agencies.

Kirby Smith & Associates, Inc.’s responsibilities for this proposed 2.1 acre self storage site have included preparation of conceptual site plans to maximize storage building square footage, while addressing existing site utility easements, and various City standards. KSA, Inc. has also provided coordination efforts on behalf of the Client with City staff and other development team consultants. Redevelopment Site Plan documents were also prepared by  KSA, Inc. and approved by the City in 2008.Kirby Smith & Associates, Inc.’s responsibilities for this proposed 2.1 acre self storage site have included preparation of conceptual site plans to maximize storage building square footage, while addressing existing site utility easements, and various City standards. KSA, Inc. has also provided coordination efforts on behalf of the Client with City staff and other development team consultants. Redevelopment Site Plan documents were also prepared by KSA, Inc. and approved by the City in 2008.

Planning services provided by Kirby Smith & Association, Inc. (KSA, Inc.) included preparation and approval processing of a Planned Unit Development Plan to rezone this 9 acre retirement community property. These plans were approved in 1997.  KSA, Inc. also prepared the site plan and landscape plans for the first phase independent living facility, and lead a coordinated effort with the architect and civil engineering consultants through the Town of Parker’s review and approval process. Site and Landscape plans were approved in October 1999. Planning services provided by Kirby Smith & Association, Inc. (KSA, Inc.) included preparation and approval processing of a Planned Unit Development Plan to rezone this 9 acre retirement community property. These plans were approved in 1997. KSA, Inc. also prepared the site plan and landscape plans for the first phase independent living facility, and lead a coordinated effort with the architect and civil engineering consultants through the Town of Parker’s review and approval process. Site and Landscape plans were approved in October 1999.

Kirby Smith & Associates, Inc. provided landscape architectural services and acted as Client’s planning liaison with City planning staff during the preparation and approval of site plans and landscape plans for three (3) limited service hotels on this 8.85 acre site.  KSA, Inc. also coordinated closely with other design team members (engineers, architect, and contractor). Kirby Smith & Associates, Inc. provided landscape architectural services and acted as Client’s planning liaison with City planning staff during the preparation and approval of site plans and landscape plans for three (3) limited service hotels on this 8.85 acre site. KSA, Inc. also coordinated closely with other design team members (engineers, architect, and contractor).

Kirby Smith & Associates, Inc. facilitated County approval of an amendment to an outdated 6.5 acre Preliminary Development Plan.  Planning services included preparation of several alternative site plan concepts to address the needs of the Client and the County’s industrial development and architectural guidelines.  Additional services as the lead consultant included preparation of PDP and Preliminary Plat submittal documents, coordination of engineering studies, and primary County contact.  PDP approved in 2002.  Similarly, KSA prepared a Final Development Plan and Final Plat submittal including detailed site plan, landscape plan and architectural elevations for the 3.4 acre southern portion of the property.Kirby Smith & Associates, Inc. facilitated County approval of an amendment to an outdated 6.5 acre Preliminary Development Plan. Planning services included preparation of several alternative site plan concepts to address the needs of the Client and the County’s industrial development and architectural guidelines. Additional services as the lead consultant included preparation of PDP and Preliminary Plat submittal documents, coordination of engineering studies, and primary County contact. PDP approved in 2002. Similarly, KSA prepared a Final Development Plan and Final Plat submittal including detailed site plan, landscape plan and architectural elevations for the 3.4 acre southern portion of the property.